
Overview
The LED array on the Bloor Street Viaduct's Luminous Veil changes in a computerized real-time response to wind velocity, with seasonal variations.
Guild's scope
- All electrical work
- Over 35,000 LED lights with controllers
- Lights, power cabinets and the computer system that runs the display
- Accelerated four-month timeframe, ready for the July 4 procession before the 2015 Pan Am Games
Connected work
Also on the line.
Projects that share a division with The Luminous Veil. Or see this division's full capabilities: Electrical Construction.
Office towers and hotelSouthcore Financial Centre
Three interconnected buildings: the Delta hotel, the Bremner tower and the PwC tower.
LOCTorontoYR2014
Production facilityPeace Naturals Phase 1
Design-Build of a large cannabis production facility, to Health Canada regulations.
LOCStaynerYR2018
Public spaceThe Bentway
Public space under the Gardiner Expressway, with distinctive lighting.
LOCTorontoYR2018